Palo Alto Central Plant

Project: Palo Alto Central Plant Owner: ACCD – Palo AltoGeneral Contractor: SpawGlassContract Amount: $1,342,000Building central plants showcases Aerohead’s experience with first class water pipe installations. Here we built a 1,200 ton capacity central plant complete with 24 inch diameter condenser water pipe installed under a road to the cooling towers. When it comes to pipe installation, Aerohead can [...]

May 9th, 2025|Projects|

ATC Airmen’s Dorm #1

Project: ATC Airmen’s Dorm #1 Owner: USACOEGeneral Contractor: Satterfield PontikesContract Amount: $12,000,000This 300,000 square foot, 1,200 man dormitory displays Aerohead’s ability to handle larger projects with the utmost skill and attention to detail. This project required over 1,600 plumbing fixtures as well as a penthouse mechanical room with the latest energy efficient HVAC equipment and controls. This project [...]

May 9th, 2025|Projects|

UTSA Combined Sciences

Project: UTSA Combined Sciences Owner: UT OFPCGeneral Contractor: GilbaneContract Amount: $5,955,000Aerohead demonstrated our ability to install extremely complex systems on this project. Here we installed two Tier 1 research laboratories, with a wash down perchloric acid exhaust system and a hydrochloric acid exhaust system. The labs also required three independent pure water systems as well as acid waste [...]

May 9th, 2025|Projects|

Ft. Sam BRAC Health Clinic

Project: Ft. Sam BRAC Health Clinic Owner: USACOEGeneral Contractor: Satterfield & PontikesProject Amount: $6,308,000At Aerohead, we have a long list of successful projects working with the Army Corps of Engineers. Our expertise working with the federal government was on display during the construction of this 170,000 square foot primary care health care facility. This project required a chilled [...]

May 9th, 2025|Projects|

St. Luke’s Phase II

Project: St. Luke’s Phase II Owner: Baptist Health SystemGeneral Contractor: Joeris GCProject Amount: $462,000Aerohead has a proven track record of being successful with both large and small projects. Each one is given the same amount of dedication to quality and owner satisfaction. In this project, we remodeled 25 patient rooms, completely updated the HVAC, plumbing, and med-gas systems [...]

May 9th, 2025|Projects|

SA Intermodal

Project: SA Intermodal Owner: Union Pacific RailroadGeneral Contractor: SpawGlassContract Amount: $1,339,000This project showcases our ability to perform unique and challenging work. This project involved the installation of over 14,000 feet of underground polypropylene compressed air piping. Additionally, two separate compressor stations were built and installed to supply the air for recharging the freight car air brakes along the [...]

May 9th, 2025|Projects|

Carrizo Springs High School

Project: Carrizo Springs High School Owner: Carrizo Springs ISDGeneral Contractor: Bartlett CockeContract Amount: $6,130.000.00As the Eagle Ford Shale area continues to grow, Aerohead is proud to be a part of that growth. This high school is an example of our ability to complete large, out of town projects with quality and on schedule. The K-12 market continues to [...]

May 9th, 2025|Projects|