Project: UTSA Combined Sciences
Owner: UT OFPC
General Contractor: Gilbane
Contract Amount: $5,955,000
Aerohead demonstrated our ability to install extremely complex systems on this project. Here we installed two Tier 1 research laboratories, with a wash down perchloric acid exhaust system and a hydrochloric acid exhaust system. The labs also required three independent pure water systems as well as acid waste systems. The labs were supplied by a central plant featuring a two story state of the art energy recovery system. Aerohead met all OFPC and owner expectations. Reference: Eric Ireton with UTSA.